THE NEW LOCO SHED

Work kicked off in earnest in July 05 when the concrete & asbestos shed (above), containing the toilet and shower, was demolished and a more suitable building (below), still containing the toilet and shower was erected with two rails set into the floor ready for a loco.

I have since extended the rails a further 30ft down the incline (1 in 10) towards the almond grove and as of now that is all the track laid until the new carriage shed is completed during the Spring of 2007.